Track record

Outcomes a regulator accepted and an operation could run.

Selected engagements across platinum, gold, coal, manganese and diamond operations.

0+

Investigations & Audits Delivered

0

Mining Commodities Served

0

Engineering Disciplines

0%

DMPR Upliftment Success Rate

Industries served

PlatinumGoldCoalDiamondManganeseZincMineral ProcessingIndustrial Manufacturing

Case studies

Selected engagements, measured outcomes.

Engineering leads every engagement; digital engineering makes the result durable and auditable. Filter by stream to see challenge, approach, results and downloadable briefs.

  • Platinum & Gold — Scraper winch failures resolved and Section 54 instruction upliftedPlatinum & Gold

    Scraper winch failures resolved and Section 54 instruction uplifted

    Repeat scraper winch failures were stopping production and exposing crews to rope and entanglement risk. We ran an independent investigation and closed the instruction out.

    Upliftment success
    100%

    Upliftment success

    Repeat failures post close-out
    0

    Repeat failures post close-out

    Investigation to closure
    6 wks

    Investigation to closure

    Read case study
  • Manganese — Shaft signalling redesigned to restore compliant hoisting availabilityManganese

    Shaft signalling redesigned to restore compliant hoisting availability

    Signalling failures on a hoisting installation were halting vertical transport. We rebuilt the signalling protocol and the compliance evidence behind it.

    Signalling compliance
    100%

    Signalling compliance

    Assessment to commissioning
    10 wks

    Assessment to commissioning

    Hoisting availability restored
    24/7

    Hoisting availability restored

    Read case study
  • Coal — Conveyor fire risk closed out after a regulator findingCoal

    Conveyor fire risk closed out after a regulator finding

    A regulator flagged conveyor fire hazards across a coal handling plant. We built the risk matrix, the preventive regime and the standards uplift that closed it.

    Finding to close-out
    8 wks

    Finding to close-out

    Transfer points remediated
    100%

    Transfer points remediated

    Belt life and throughput

    Belt life and throughput

    Read case study
  • Diamond — Dewatering stabilised after recurring pump station failuresDiamond

    Dewatering stabilised after recurring pump station failures

    Repeat pumping failures threatened the water balance of an operating mine. A structured audit rebuilt both the system and the reporting around it.

    Energy per m³ pumped

    Energy per m³ pumped

    Audit to closure
    7 wks

    Audit to closure

    Dewatering stoppages after handover
    0

    Dewatering stoppages after handover

    Read case study
  • Multi-commodity — Engineering KPI dashboard that made downtime visible to the excoMulti-commodity

    Engineering KPI dashboard that made downtime visible to the exco

    Maintenance data existed but nobody could act on it. We built the engineering KPI layer that turns plant data into weekly decisions.

    Consolidated reporting model
    1

    Consolidated reporting model

    Concept to live dashboard
    9 wks

    Concept to live dashboard

    Engineering decision cadence
    Weekly

    Engineering decision cadence

    Read case study
  • Platinum — Paper inspections replaced with digital forms and tracked actionsPlatinum

    Paper inspections replaced with digital forms and tracked actions

    Findings were being raised and then quietly lost. Electronic inspections plus corrective action tracking closed that gap.

    Findings with an owner and due date
    100%

    Findings with an owner and due date

    Rollout duration
    6 wks

    Rollout duration

    Paper checklists in the loop
    0

    Paper checklists in the loop

    Read case study
  • Coal & Manganese — Compliance monitoring that keeps a regulator submission audit-readyCoal & Manganese

    Compliance monitoring that keeps a regulator submission audit-ready

    A live compliance register, incident reporting and regulatory reporting workflow — so the next audit is never a scramble.

    Compliance position
    Live

    Compliance position

    Implementation
    12 wks

    Implementation

    Regulator reporting packs
    1-click

    Regulator reporting packs

    Read case study

Investigation workflow

From incident to regulatory upliftment.

Our investigation methodology is structured, evidence-led and built to close out.

  1. 01

    Incident

    Formal notification and site securing.

  2. 02

    Investigation

    Evidence gathering, interviews and site inspection.

  3. 03

    Root Cause Analysis

    Structured RCA against MHSA principles.

  4. 04

    Fishbone Analysis

    Ishikawa diagnostics across man, machine, method, material.

  5. 05

    Corrective Actions

    Prioritised action plans with owners and due dates.

  6. 06

    DMPR Presentation

    Boardroom-ready evidence pack for the regulator.

  7. 07

    Regulatory Upliftment

    Section 54 / Section 55 instruction upliftment.

Let's solve the engineering problem in front of you.

Whether it's a regulator instruction, a failing asset or a capital project, we start with an honest engineering assessment.