ManganeseShaft signalling redesigned to restore compliant hoisting availability
Signalling failures on a hoisting installation were halting vertical transport. We rebuilt the signalling protocol and the compliance evidence behind it.
- Signalling compliance
- 100%
- Assessment to commissioning
- 10 wks
- Hoisting availability restored
- 24/7
Signalling compliance
Assessment to commissioning
Hoisting availability restored


