PlatinumPaper inspections replaced with digital forms and tracked actions
Findings were being raised and then quietly lost. Electronic inspections plus corrective action tracking closed that gap.
- Findings with an owner and due date
- 100%
- Rollout duration
- 6 wks
- Paper checklists in the loop
- 0
Findings with an owner and due date
Rollout duration
Paper checklists in the loop


