Digital engineering case study

Compliance monitoring that keeps a regulator submission audit-ready

A live compliance register, incident reporting and regulatory reporting workflow — so the next audit is never a scramble.

Commodity
Coal & Manganese
Location
Delivered with Thomvision Projects & Solutions
Duration
12 weeks

The challenge

Compliance obligations, audit findings and incident actions lived in separate registers, making it impossible to state a current compliance position with confidence.

Our approach

  1. 01

    Obligation register

    MHSA obligations mapped to responsible engineers and verification evidence.

  2. 02

    Incident workflow

    Incident capture, investigation status and corrective action linked in one chain.

  3. 03

    Monitoring dashboards

    Live compliance position by site, discipline and due date.

  4. 04

    Regulator reporting

    One-click reporting packs formatted for regulator submission.

Outcomes

  • Current compliance position available at any time
  • Investigation and action status linked to the original finding
  • Regulator packs produced without manual assembly

More digital engineering case studies

  • Multi-commodity — Engineering KPI dashboard that made downtime visible to the excoMulti-commodity

    Engineering KPI dashboard that made downtime visible to the exco

    Maintenance data existed but nobody could act on it. We built the engineering KPI layer that turns plant data into weekly decisions.

    Consolidated reporting model
    1

    Consolidated reporting model

    Concept to live dashboard
    9 wks

    Concept to live dashboard

    Engineering decision cadence
    Weekly

    Engineering decision cadence

    Read case study
  • Platinum — Paper inspections replaced with digital forms and tracked actionsPlatinum

    Paper inspections replaced with digital forms and tracked actions

    Findings were being raised and then quietly lost. Electronic inspections plus corrective action tracking closed that gap.

    Findings with an owner and due date
    100%

    Findings with an owner and due date

    Rollout duration
    6 wks

    Rollout duration

    Paper checklists in the loop
    0

    Paper checklists in the loop

    Read case study